10/9/2023 0 Comments Scrum guide 2020![]() In this blog, I will address the benefits of the renaming, and the incongruence of the definition of Increment when applied to knowledge-acquisition work. However, the new name and its formal definition in the Scrum Guide does not fully address the breadth of work types (i.e., product backlog item types) that a team can accomplish during a sprint. I believe there is a benefit to this renaming. The 2020 version of the Scrum Guide defines an artifact by the name of “Increment.” This represents a renaming of an already existing Scrum artifact that historically was referred to as either “potentially releasable product increment” or a “ potentially shippable product increment.”
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |